2 Commits
Author SHA1 Message Date
Stefan Lazic 17eee5b932 Updates 1
CI / ci (push) Canceled after 0s
The session built:

Appointments page: a single list, newest first.
Block Time: edit and delete.
Customer CSV export: with barber notes excluded.
Guest-link regression test: a test that an appointment id alone is rejected, plus fixes to the stale docs.

It built the scheduler, job runner with live progress, backup and restore, and the health alerts. Its own report says a real delete-and-restore on throwaway Docker passed, but I haven’t repeated that. It also says real SMTP and large dumps were not exercised. The manager image needs rebuilding for the backups to work, because it now installs 7zip.
2026-10-17 22:29:00 +01:00
Stefan Lazic 6ae145d187 Phase 4
Seed data extended with a second barber (different hours/services), a beard-trim service + category, breaks, time off, a guest customer, and appointments in all three key states — verified against a live throwaway Postgres.
14 new integration tests (38 total with Phase 3's) covering guest/authenticated booking, any-barber assignment, slot-conflict handling, ownership enforcement, guest-data isolation, and book-again repricing.
Playwright E2E suite for the 6 required customer journeys, with its own global-setup.ts that migrates and seeds a database automatically.
Full verification pass, which caught and fixed three real bugs along the way (not just test-workarounds):
A date off-by-one bug in the calendar picker that made real weekdays show as closed for anyone in a UTC+ timezone (including the business's own).
A dialog that could vanish mid-confirmation on cancellation, before the customer could read the late-cancellation notice.
A silent test-cleanup leak in the Phase 3 fixtures that had been leaking stray businesses since Phase 3.
Plus a baseline desktop-responsive fix (centered max-w-2xl columns) across Home/Appointments/Settings/booking flow, since desktop had been effectively unstyled.
Final state: 90 unit tests, 38 integration tests, and all 6 E2E journeys passing together on a fresh database; clean tsc, eslint, and next build. Full writeup with routes, security model, guest-matching rules, known limitations, and what to check before Phase 5 is in docs/phase-4-summary.md.
2026-08-02 21:39:24 +01:00