The session built:
Appointments page: a single list, newest first.
Block Time: edit and delete.
Customer CSV export: with barber notes excluded.
Guest-link regression test: a test that an appointment id alone is rejected, plus fixes to the stale docs.
It built the scheduler, job runner with live progress, backup and restore, and the health alerts. Its own report says a real delete-and-restore on throwaway Docker passed, but I haven’t repeated that. It also says real SMTP and large dumps were not exercised. The manager image needs rebuilding for the backups to work, because it now installs 7zip.
Owner Administration is complete. Summary of this final stretch of work:
Seed data extended with an inactive staff member, a pending invitation, a redeemed-reward fixture, a service with no eligible staff, and a future-appointment fixture for conflict testing — all idempotent, verified against the dev DB.
Testing brought to 179 unit / 86 integration / 27 E2E tests, all passing together on a freshly seeded, disposable Postgres:
Unit tests for every new pure validator (business hours, categories/services, booking rules, loyalty config, staff creation).
Integration tests covering opening-hours conflicts, last-owner protection, staff deactivation/eligibility conflicts, loyalty redemption's atomic race-guard, and owner-vs-barber/business-isolation authorization — all against a real Postgres.
12 new Playwright owner journeys, which surfaced and fixed two genuine issues along the way: a cookie-clearing race condition in the sign-out-mid-test flow (a real, reproducible timing bug, not just a test artifact), and confirmation that seed fixtures upserted by deterministic ID go stale once "today" has moved on — now handled defensively.
Desktop responsiveness: converted the single-column Business Details, Booking Rules, and Loyalty Configuration forms to a genuine two-column layout at the lg: breakpoint (verified via measured element positions, not just screenshots), confirmed mobile stacking is unaffected.
Final verification: clean tsc, eslint, and next build, plus the full three-suite run against one fresh database as the authoritative pass.